ToDo List – Basement Bathroom Reno [2]

With the bulk of the previous ToDo list being complete, I thought I’d sit down and think of the next wave for the project.

From the last list, still outstanding are:
– wire electrical outlet
– drain for the tub needs to be finalized (This I will wait on untill I have a tub, in order to locate it)

New list:
– run plumbing and drain
….-> For drains:
………- Toilet is complete
………- Sink will run towards the outter wall, run along the outer wall, and meet
…………up with the current sink location.
……….- Bathtub will Tee in to the existing sink drain.
…..->For water supply:
……….- Chop off whatever is there existing and run line (Pex) to the tub (on
………..the furnace room wall) and along the outside wall for the sink.
…..-> For the tub, a copper line setup will be needed for the shower setup
– buy a new light fixture to replace the one that’s broken.

– Drywall, concrete board, tile the floor and part of the walls